For example: terracotta, frost, BIM

    A residential tower clad in Terracotta clinker tile

    Clinker born in Kazakhstan

    First tile 10.04.2027 176 days to go

    Pre-orderChoose a shade

    A city at dawn: new quarters with clinker facades, trees and soft lightVisualisation

    Mission

    We make cities more beautiful and architecture lasting

    Қалалардың жаңа келбеті · A new face for our cities

    QAZCLINKER makes facade materials that help buildings stay relevant, expressive and beautiful for many years.

    Pick a shade and see your facade

    Terracotta RAL 8004. Altyn-Emel Open shade

    Visualisation. Tile colour and texture come from the QAZCLINKER catalog; the buildings are generic.

    • 1,000,000m²

      of clinker tile a year

      plant capacity

    • 23

      shades in four collections

      from ash grey to ocean depth

    • 1100–1300°C

      firing temperature

      where clay becomes stone

    • 95%

      of the hall is built

      as of September 2026

    Four collections, four landscapes

    The palette was created by ceramist Altynai Baizhan. The laboratory tested every colour at 1100 °C and in frost.

    Three values, one idea: a new face for our cities

    • An architect with a clinker tile sample beside a brick facadeVisualisation

      People are the main value.

      Cities are made not by materials alone but by people: architects, engineers, builders, developers, manufacturers, public clients and residents. QAZCLINKER helps them create an environment they can be proud of.

    • A calm residential courtyard with clinker facadesVisualisation

      Quality without compromise.

      Building seriously means thinking not about the day a project is handed over but about how the building will look and work years later. Quality becomes not an advertising promise but a condition of lasting architecture.

    • An engineer in a white helmet looks over the city at sunsetVisualisation

      Continuous improvement.

      A strong company does not consider itself finished. Production, service, logistics, range, showroom, technical support and work with the professional community must keep developing.

    Stone made from clay

    Clinker is clay fired to the density of stone. It does not absorb water, does not fear frost and does not fade, so a clinker facade looks the same decades later. QAZCLINKER makes it from natural clay and mineral pigments to GOST 13996-2019.

    GOST minimumQAZCLINKER 2026, samplesQAZCLINKER 2027, target

    1. Water absorption (lower is better)

      GOST minimumup to 6%
      QAZCLINKER 2026, samplesup to 3%
      QAZCLINKER 2027, targetup to 3%
    2. Frost resistance

      GOST minimum100 cycles
      QAZCLINKER 2026, samples200 cycles
      QAZCLINKER 2027, targetup to 300 cycles
    3. Bending strength

      GOST minimum20 MPa
      QAZCLINKER 2026, samples26 MPa
      QAZCLINKER 2027, targetat least 28 MPa
    4. Breaking load

      GOST minimum950 N
      QAZCLINKER 2026, samples1300 N
      QAZCLINKER 2027, targetat least 1300 N

    Hatching marks the goal for serial production. Data from the QAZCLINKER catalog and GOST 13996-2019. Fire safety: class NG (non-combustible) in every column.

    All values in a table
    PropertyQAZCLINKER 2026QAZCLINKER 2027GOST 13996-2019
    Water absorptionup to 3%up to 3%up to 6%
    Frost resistance200 cyclesup to 300 cycles100 cycles
    Bending strength26 MPaat least 28 MPa20 MPa
    Breaking load1300 Nat least 1300 N950 N
    Fire safetyNG (non-combustible)NG (non-combustible)NG (non-combustible)

    2026 samples are from the laboratory, 2027 values are the goal for serial production. QAZCLINKER catalog, GOST 13996-2019.

    How a clinker facade looks

    Deep colour, living texture, a crisp joint. These photos from the QAZCLINKER catalog show what each collection aims for.

    Residential complex with a red clinker facade and a green courtyard
    Red clinker, residential complex
    Facade in orange clinker with tall windows
    Orange clinker, tall windows
    Curved building with a red clinker facade
    Curved facade, red clinker
    Towers in dark and red clinker with a footbridge
    Dark and red clinker, a bridge between towers
    Dark clinker facade with red vertical stripes
    Dark clinker with red stripes
    Grey clinker facade with a grid of balconies
    Grey clinker, a grid of balconies
    Clinker residential towers by the water
    Clinker towers by the water
    Rust-coloured facade with vertical fins
    Rust-coloured facade, vertical fins

    Reference facades from the QAZCLINKER catalog, not the plant's projects. The whole gallery

    The plant is rising before our eyes

    Construction began in April 2025. Today the hall is 95 percent complete, the kiln is being assembled and the laboratory is already working. The first tile leaves the line on 10 April 2027.

    Earthworks on the plant construction site, April 2025
    The steel frame of the main hall on the construction site
    A QAZCLINKER laboratory technician at work
    The plant site in winter
    Interior construction works in the hall
    Specialists on site while the production lines are prepared
    The QAZCLINKER palette presented at Tanu Design Tour
    Equipment installation in the main production hall
    Clinker tile samples in different shades
    The production hall along the line, September 2026
    1. The plant foundation is laid in Karaganda.

    2. The steel frame of the main production hall is complete.

    3. QAZCLINKER's own laboratory is launched.

    4. The Development Bank of Kazakhstan supports construction of the plant.

    5. Active phase of interior construction works.

    6. QAZCLINKER and Sabo Group prepare the production lines. The akims of the region and of Karaganda visited the site.

    7. The palette is presented at Tanu Design Tour.

    8. Block A is ready for equipment installation. The tunnel kiln is built, vaults are 70% complete.

    9. The laboratory defines four base colour directions.

    10. The hall is about 95% complete. The date of first product is announced.

    Dates from QAZCLINKER news. The full story of the plant

    Lines from the world leaders

    The plant is equipped by SABO of Greece, Keller of Germany, SMAC of Italy and Plinfa of Ukraine: companies that build ceramic plants all over the world.

    • Greece

      Automation and lines for ceramics: 800 projects in 55 countries.

    • Germany · since 1894

      Technology for the ceramics industry.

    • Italy · since 1975

      Automation and glazing lines.

    • Ukraine · since 1902

      Extruders for clinker tile.

    Hold the colour in your hands

    We bring tile samples and layout boards to your office. Leave your name, phone and city, and pick the fixing system.

    By submitting, you agree to the privacy policy. Privacy policy

    This starts a calculation, it is not a contract.

    Documents at hand

    The catalog, BIM models and test protocols: everything an architect or buyer needs, in one library. It holds 7 documents now, each showing its owner, validity and status. Passports for serial tile arrive with the first production run.

    The whole document library

    Building in 2027? Reserve your colour early

    Leave the city and the facade area. The trading house Exterior Solution will calculate the material, choose the fixing and send samples.

    By submitting, you agree to the privacy policy. Privacy policy

    This starts a calculation, it is not a contract.

    Call WhatsApp